Start planning office IT at least 6–8 weeks before moving. Order internet lines from du or e& first, because installation can take weeks. Design network cabling and Wi-Fi access point positions before ceilings and furniture are finished. Then set up the firewall, switches, phone system, printers, CCTV and access control, migrate email and files, and test everything before staff arrive. A detailed checklist and one person responsible for IT keeps the move on schedule.
Key takeaways
- Order internet lines first; they often take the longest.
- Finalise cabling and access point positions before ceilings close.
- Plan a second internet line for failover if downtime is costly.
- Label every outlet and document all passwords and settings.
- Test everything before day one, then support staff on the first morning.
Timeline
| When | What to do |
|---|---|
| 6–8 weeks before | Order internet lines and phone numbers; survey the space; agree IT budget |
| 4–6 weeks before | Design cabling, rack location, Wi-Fi, CCTV and access control with the fit-out contractor |
| 3–4 weeks before | Install cabling, rack, UPS; order firewall, switches, access points, phones, printers |
| 1–2 weeks before | Install and configure network, Wi-Fi, phones, printers, CCTV; test internet |
| Moving weekend | Move and connect PCs and servers; test every desk, phone and printer |
| First week | On-site support for staff; fix issues; update documentation |
The checklist
Connectivity
- Main fibre internet line, plus a second line from another provider if downtime is costly
- Phone numbers moved or new numbers ordered (SIP trunk for 3CX)
- Static IP if needed for VPN or remote access
Infrastructure
- Cat6/Cat6A data points at every desk, printer, TV and meeting room
- Ceiling points for Wi-Fi access points and cameras
- Cooled server/comms room or cabinet with UPS
- Business firewall, managed PoE switches and access points
Systems
- Phone system: 3CX with IP phones and mobile apps
- Printers and scanners with scan-to-email or scan-to-folder
- CCTV and access control, coordinated with security and fire safety requirements
- Meeting room screens and video conferencing
Data and accounts
- Email on Microsoft 365 or Google Workspace with SPF, DKIM and DMARC
- Shared files on a NAS or SharePoint, with backups running from day one
- Asset list of every device, with serial numbers and warranty dates
- All passwords and configurations documented and stored securely
Common moving-day problems
- Internet line not ready, so the office opens without internet
- Not enough data points, leading to messy switches under desks
- Printers and scanners not reconfigured for the new network
- Phone numbers not moved in time
- No one knows the Wi-Fi password or admin logins
Frequently asked questions
How early should we plan IT for an office move?
Start at least 6 to 8 weeks before the move. Internet lines and cabling usually need the most lead time.
How many network points does each desk need?
Plan at least two data points per desk, plus points for printers, TVs, meeting rooms, ceiling Wi-Fi access points and cameras.
Do we need two internet lines?
If losing internet stops your business, a second line from a different provider with automatic failover on the firewall is worth it.
Can we keep our phone numbers when moving?
Usually yes. Ask your operator early, and plan the number transfer to happen on the moving date.
What should IT hand over after the move?
A network drawing, labelled outlets, an asset list, and all passwords and configurations documented securely.
This guide is general information to help you plan. Requirements and products change, so confirm details for your own site before you buy or install.